山东电缆桥架立柱安装

1、立柱焊接在垫板上。焊接前要根据土建所给标高确定安装高度及立柱长度。

1, in the plate on the post welding. Before welding construction according to the given elevation determine

installation height and column length.

2、将制作好的垫板按桥架走向确定好安装位置,安装时同一排垫板的偏差尽量缩小,防止确定好立柱安装位置后不能焊接在垫板内

2, plate making good according to the bridge to determine good installation location, installation deviation with a

row of plate narrow as far as possible, prevent to determine a good column cannot be installed in the plate inposition after welding

3、垫板的固定方式根据桥架的大小、层数(即重量)确定,一般为四角固定。当桥架较轻时也可两点固定,但必须达到足够的强度

Fixed mode 3, pad size, number of layers according to the bridge (i.e. weight) determined, generally four anglefixed. When the tray is light when can two fixed, but must achieve enough strength

4、根据土建所给标高,确定两端立柱焊接位置,立柱焊接在垫板上,焊接前使用水平尺进行检测以保证立柱垂直度。

4, according to the civil engineering to determine the elevation, the upright post are welding position, welding inthe plate column, feet were detected to ensure vertical column using the level before welding.

5、在两端立柱上下各拉一根细线,用于确定中间立柱焊接位置。

5, at both ends of each column on pulling a thread, used to determine the intermediate post welding position.

6、中间立柱焊接前,用水平尺对相邻的两个侧面进行检测,防止左右及前后倾斜。

Welding in 6, intermediate post before, were detected with horizontal feet two sides of adjacent, prevent the leftand right and front and rear tilt.

7、立柱与垫板焊接时,要对立柱的内外两侧施焊,焊缝均匀饱满。焊接时一般外侧满焊,内侧分段焊接,槽钢拐角处,两侧各留10mm不焊接。

7, column and plate welded to the column, both inner and outer sides of the welding, weld uniform full. When a fullweld welding general lateral, medial segment welding, steel corner, on both sides of the left 10mm welding.